Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 16 results ...

Alkass, S, Aronian, A and Moselhi, O (1993) Computer‐Aided Equipment Selection for Transporting and Placing Concrete. Journal of Construction Engineering and Management, 119(03), 445–65.

Beliveau, Y, Dixit, S and Dal, T (1993) Dynamic Damping of Payload Motion for Cranes. Journal of Construction Engineering and Management, 119(03), 631–44.

  • Type: Journal Article
  • Keywords: Cranes; Damping; Dynamic response; Construction equipment; Control; Loads;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1993)119:3(631)
  • Abstract:
    The paper describes a novel strategy for damping of payload motion for various kinds of cranes used in construction, i.e., mobile cranes, boom or tower cranes and so forth, which can be implemented on existing equipment. Most research in this area concentrates on controlling the velocity and accelerations to eliminate inertial forces. However, it is almost impossible to realistically model the effects of wind, slippage of tires, or settlement of supports, etc. The research proposes an approach to control the swaying of the payload, regardless of the cause. The control strategy is based on applying periodic balancing forces and moments to the cable to damp out oscillations as and when detected. A feedback control system applied to the cable has the potential of providing an inexpensive and easily implemented solution. This is achieved by decoupling the payload and cable system from the structural members of the crane during the development of the control strategy. Effective control of the payload will improve safety, productivity and timeliness for a number of material handling operations.

Bernold, L E and Guler, N (1993) Analysis of Back Injuries in Construction. Journal of Construction Engineering and Management, 119(03), 607–21.

Gonzalez‐Quevedo, A A, AbouRizk, S M, Iseley, D T and Halpin, D W (1993) Comparison of Two Simulation Methodologies in Construction. Journal of Construction Engineering and Management, 119(03), 573–89.

Hadavi, A and Krizek, R J (1993) Short‐Term Goal Setting for Construction. Journal of Construction Engineering and Management, 119(03), 622–30.

Halpin, D W (1993) Process‐Based Research to Meet the International Challenge. Journal of Construction Engineering and Management, 119(03), 415–25.

Hicks, J C (1993) Haul‐Unit Performance. Journal of Construction Engineering and Management, 119(03), 646–53.

Hornaday, W C, Haas, C T, O'Connor, J T and Wen, J (1993) Computer‐Aided Planning for Heavy Lifts. Journal of Construction Engineering and Management, 119(03), 498–515.

Laufer, A, Shapira, A, Cohenca‐Zall, D and Howell, G A (1993) Prebid and Preconstruction Planning Process. Journal of Construction Engineering and Management, 119(03), 426–44.

Mallon, J C and Mulligan, D E (1993) Quality Function Deployment—A System for Meeting Customers' Needs. Journal of Construction Engineering and Management, 119(03), 516–31.

McCahill, D F and Bernold, L E (1993) Resource‐Oriented Modeling and Simulation in Construction. Journal of Construction Engineering and Management, 119(03), 590–606.

Moselhi, O, Hegazy, T and Fazio, P (1993) DBID: Analogy‐Based DSS for Bidding in Construction. Journal of Construction Engineering and Management, 119(03), 466–79.

Pau, S H, Chau, K W and Wong, W G (1993) Prospects for No‐Dig Technology in Hong Kong Construction Industry. Journal of Construction Engineering and Management, 119(03), 550–9.

Recarte Suazo, G A and Jaselskis, E J (1993) Comparison of Construction Safety Codes in United States and Honduras. Journal of Construction Engineering and Management, 119(03), 560–72.

Slaughter, E S (1993) Builders as Sources of Construction Innovation. Journal of Construction Engineering and Management, 119(03), 532–49.

Zack, J G (1993) “Claimsmanship”: Current Perspective. Journal of Construction Engineering and Management, 119(03), 480–97.